SWFL Hardening Free quote

Independent guide · not a government site

Stuck on an MSFH portal status? Here's what it means.

Plain-English meanings for every My Safe Florida Home case status, plus the grant basics.

Up to $10,000state grant, $2 for every $1 you spend[7]
4 improvementsonly if your inspection recommends them[4]
Licensed & permittedwork only, with required local inspections[7]

Before the upgrade, applications went through the Applicant Portal, starting with a Prioritization Questionnaire. The steps and status labels below reflect that older workflow and may change.[10] Low-income applicants may not need to match.[7]

Every portal status, explained

Tap a status. Meanings are summarized from the program's own status list.[3][9] The official portal is the final word.

Prioritization Questionnaire in Progress

Finish the questionnaire to be sorted into a group.

Inspection Group 1–5

You're sorted. Your group sets when the next application opens.

Inspection Application Submitted / Under Review

Waiting for, or assigned to, a Case Manager.

Schedule and Complete Inspection

An inspection company will contact you to schedule.

Inspection RFI Response Pending

More info needed. Reply within 60 days or the case is closed as abandoned.

Mitigation Inspection Complete / Incomplete

Report delivered, or the inspection wasn't finished (contact the inspection company).

Indicate Interest in Grant Application

Your report has recommendations. Log in and indicate interest.

Pending Grant Group Sorting

Waiting to be placed in a grant group.

No Recommendations – Cannot Proceed with App

No improvements were recommended, so no grant application.

Grant Group 1–4

Sorted for grant application access.

Grant Group 5 – Cannot Proceed

Above the moderate-income limit, so not eligible for grants.

Grant Application Submitted / Review

Waiting for, or under, Case Manager review.

Grant RFI Response Pending

More info needed. Reply within 60 days.

Approved to Complete Recommended Work

Work on the recommended items may begin. Read your report and the Homeowners Guide first.

Final Inspection Requested / In Progress / Not Completed

Final inspection is queued, being scheduled, or wasn't completed.

Submit Reimbursement Request

Final report uploaded. Submit your Draw Request.

Draw Request Submitted / Under Review / Secondary QC

Every draw gets two reviews, in the order received. Act only if you get an RFI.

Pending Draw RFI Response

More info needed. Reply within 60 days.

Draw Request Review Complete

Approved. Allow at least three weeks for the check.

Payment Processed

The check was mailed. It can't go to an active USPS forwarding address.

Case Closed (various)

Reimbursed, duplicate, Group 5, inspection expired (no grant application within 24 months), or denied/withdrawn.

Official MSFH call center: 850-427-2559

Sources (Last verified Oct 22, 2026)
  1. Fla. Stat. 215.5586
  2. MSFH Support Center: Authorized improvements
  3. MSFH: Is funding available? (modified Aug 17)
  4. MSFH 2.0 Applicant Portal Terms (modified Jul 9)
  5. MSFH: Draw request review times
  6. mysafeflhome.com

Get your free quote

We review your request and connect you with a local installer serving your area.

This opens an email draft. Nothing is sent until you send it. If no email app opens, set a default email app and try again.

Get a free quote